REAL HOMES. REAL RESULTS.

Project Spotlights

Detailed case studies of our recent drywall repair, interior painting, and popcorn ceiling removal projects across Sussex County.

Lewes, DE — Water Damage Repair

HVAC Overflow — Ceiling Repair

The Situation

An HVAC unit overflow saturated a living room ceiling, requiring immediate mitigation. After the area was dried and rough cuts were made by the mitigation crew, the homeowner needed a restoration that went beyond a basic patch—a clean, solid repair done right the first time.

Technical Process

  • Mitigation cuts squared and corrected for a structurally sound layout
  • RockSplicer backing installed to create a recessed, factory-style joint
  • Rockwool insulation added to the cavity for thermal and acoustic performance—a practical choice given the proximity to the HVAC unit
  • 1/2" MR (Moisture Resistant) drywall installed as added protection given the area’s history
  • Finished with QuickSet 5 and dustless sanding to maintain a clean environment
  • Primed with Sherwin-Williams ProBlock, then one coat ceiling paint on the repair area
  • Two full coats applied throughout the living room and kitchen for a uniform, refreshed finish
  • Cased opening scraped, sanded, skimmed, primed, and painted with 2 coats Emerald Urethane Enamel with DAP Extreme Stretch at transitions

Why RockSplicer

Standard butt joints in drywall sit slightly raised, requiring wide feathering to blend. RockSplicer eliminates that by creating a recessed joint that finishes flat—similar to factory-tapered edges. The result is a stronger panel, a tighter blend, and fewer ridges. When the opportunity presents itself, we use it because a better joint means a better finish.

Millsboro, DE — Plantation Lakes

Multi-Phase Interior Transformation

The Challenge

A homeowner recently relocated from New Jersey needed a comprehensive interior update. The project had to be executed in scattered phases—each portion fully prepped, protected, completed, cleaned, and re-prepped again before moving to the next stage to accommodate their move-in schedule.

Drywall Repair & Prep

  • Full interior drywall repairs
  • All repairs primed and sealed with Sherwin-Williams ProBlock
  • Multi-stage prep cycles: protect, repair, clean, prep, cut, clean, final prep, roll, final clean

Premium Finishes

  • Ceilings: Two coats SW Premium Ceiling Paint
  • Walls: Trade Wind (SW 7617) — Emerald Designer Edition, Eggshell
  • Accent Walls: Slate Tile (SW 7624) — Emerald Designer Edition
  • Trim & Doors: 20 doors, baseboards, casings in Emerald Urethane (Extra White, Semi-Gloss)
  • Caulking: DAP Extreme Stretch throughout

Modern Upgrades

Removed all dated gold/brass hardware and installed new matte black hinges, fixtures, and lighting throughout—including replacing the chandelier and sunroom fixtures.

Selbyville, DE — The Overlook

Whole-Home Drywall Repair

The Challenge

A newer construction home in The Overlook community was showing typical settling issues throughout—cracked tape seams, nail pops, corner bead damage, and crown separation across multiple rooms. The homeowner wanted every room addressed in one visit rather than chasing individual repairs over time.

Scope of Work

  • Foyer & Stairwell: Corner bead repair, tape seams on landing, angle repairs on front door walls
  • Bedrooms (4): Nail pops, corner tape seams, crown caulk, closet repairs, light switch area patches
  • Master Suite: Tape seams near return and above TV, bathroom corner repairs, closet skim patch
  • Hallway: Seams above TV and HVAC closet
  • Additional repairs were added during the process as more issues were uncovered

Finish

All repairs were primed, sealed, and painted using Sherwin-Williams Rock Candy (SW-6231) and City Loft on walls. The result: every room in the house looks like it was just built—without the settling cracks that come with new construction.

Fenwick West, DE — Repeat Customer

Popcorn Ceiling Removal — 3 Bedrooms

The Challenge

A repeat customer who previously had us remove popcorn from both bathrooms, the laundry/utility room, and the living room/kitchen called us back to finish off the last 3 bedrooms. The goal: get the entire home popcorn-free.

Our Process

  • All areas prepped and protected with plastic sheeting and tape
  • Popcorn texture wet-scraped from all three bedroom ceilings
  • Drywall repairs made where needed
  • Ceilings skimmed with 2 coats of ultra-lightweight joint compound
  • Sanded smooth using Festool dustless sanders
  • Primed and sealed with Premium Pro Block
  • Painted with 2 coats of Sherwin-Williams Premium Ceiling Paint

The Result

Three bedrooms went from dated popcorn texture to smooth, modern ceilings ready for the homeowner to paint the walls themselves. The Festool dustless sanding system kept the mess contained—no dust throughout the rest of the home.

Millsboro, DE

Remodel Paint Job

The Project

Paint work for a bathroom remodel in Millsboro. The homeowner chose Alabaster (SW-7008) as the primary color—a warm, versatile white that works well in both natural and artificial light.

Materials & Finish

  • Ceilings: SW Pro Mar White, Flat Finish
  • Walls: SW Cashmere Alabaster, Eggshell Finish
  • Trim/Casing/Doors: SnapDry Extra White, Semi-Gloss Finish
Oceanfront Condo

Textured Concrete Wall & Ceiling Repairs

The Project

A heavily textured concrete wall in this oceanfront condo needed a complete surface renovation. The existing texture was rough and outdated, and the hall and kitchen ceilings had failing tape seams that needed to be addressed.

What Was Done

  • Heavily textured concrete wall wrapped with Fiba Fuse
  • Skim coated for a smooth, uniform surface
  • Primed/sealed using Zinsser BIN
  • Painted 2 coats of Sherwin-Williams Emerald Pure White (SW-7005) in a matte finish
  • Drywall tape seam repairs completed on hall ceiling and kitchen ceiling
  • Ceilings painted 2 coats using SW Premium Ceiling Paint in the brightest white flat finish
Residential Drywall Installation

Drywall Installation — 11 Sheets

The Project

Hang and finish 11 sheets of drywall in a residential home. Every joint was treated with the appropriate tape system for its location, and the entire job was brought to a Level 4 finish—ready for primer and paint.

What Was Done

  • Hung and finished 11 sheets
  • Paper tape in the angles
  • Fiba Fuse on the flats and butts
  • Trim-Tex Fast Edge for outside corners
  • Taped with USG All-purpose
  • Level 4 finish using ProForm 5 minute quick-set
  • Dustless sanding
  • Prime/seal using KILZ Drywall Primer
Bethany Beach, DE

Popcorn Texture Removal

The Project

Full popcorn texture removal in a Bethany Beach home with vaulted ceilings and skylights. The scope also included water damage repairs and a master bathroom repaint.

What Was Done

  • Prep/contain
  • Scrape texture from all ceilings
  • Sand ceiling using Festool Planex
  • Multiple drywall repairs throughout using Fiba Fuse MAX
  • Seal water stains using BIN Shellac
  • Skim coat as needed throughout
  • Dustless sanding using Festool Planex
  • Prime/seal using Sherwin-Williams Prep-rite Pro-block
  • Paint 2 coats using SW Premium Ceiling Paint for that bright flat white finish
  • Cut in 2 coats all walls
  • Water damaged drywall repairs and re-paint of master bathroom
Fenwick Island, DE

First Floor Drywall Repair & Ceiling Repaint

The Project

The entire first floor of this Fenwick Island home had failing tape seams throughout. Rather than patching individual spots, every damaged seam was cut out and redone properly—550 screws were installed to secure the existing drywall before any taping began.

What Was Done

  • Prep/protect
  • Cut out all damaged tape seams
  • Secured existing drywall (550 screws)
  • Removed disconnected smoke detectors, outdated thermostats, security control panels, and unused doorbell—then patched holes
  • 4 locations of cracked cornerbead secured and taped/repaired using Fiba Fuse
  • All ceiling tape seams taped and finished using Fiba Fuse
  • Dustless sanding throughout
  • All repairs primed/sealed using Zinsser
  • Walls matched using Sherwin-Williams Cashmere
  • Ceiling painted 2 coats in SW Premium Ceiling Paint
Sussex County, DE

Water Damage Ceiling Repair

The Project

An HVAC unit overflow damaged the ceiling drywall and saturated the insulation above. The affected area was removed, treated, and rebuilt with materials selected for the specific conditions of the space.

What Was Done

  • Prep/protect
  • Remove damaged drywall
  • Remove all affected insulation
  • Bag/disposal
  • Clean all joists with Fiberlock Shockwave
  • Install Rockwool Insulation
  • Install 1/2" Drywall
  • Prime/seal using BIN Shellac
  • Paint affected area 1 coat of matching ceiling paint
  • Paint entire ceiling 1 coat for a uniform finish
Ocean City

Bedroom & Laundry Room Renovation

The Project

A bedroom and laundry room renovation that included paneling removal, popcorn ceiling scraping, and a water damage repair in the bathroom. The laundry room studs and joists were treated with an EPA-approved antimicrobial before new drywall went up.

What Was Done

  • Prep/protect
  • Detach doors/trim
  • Demo and disposal of all paneling and crown moulding
  • Studs and joists in laundry room treated with EPA-approved antimicrobial
  • Scrape popcorn ceiling
  • Tape/finish walls using Fiba Fuse and Fast Edge
  • Application of GARDZ to ceiling
  • Multiple drywall repairs on ceiling, secured entirely with roughly 55 screws
  • Two skim coats applied to ceiling
  • Dustless sanding
  • Prime/seal using Zinsser Cover Stain
  • Two coats of SW Premium Ceiling Paint applied to ceiling
  • Two coats of SW Duration Quicksilver (SW-6245) in a matte finish applied to walls
  • Clean up/vacuum
Laurel, DE

Dining Room Ceiling Retrofit

The Project

A section of ceiling where 12" x 12" gypsum lath tiles had failed—likely due to prior water intrusion. Rather than patching the isolated area, the entire dining room ceiling was reworked to ensure structural integrity and visual uniformity. The new ceiling was transitioned into the adjoining room for a consistent finish across the space.

What Was Done

  • Removed all ceiling tiles to eliminate future risk
  • Installed 5/8" drywall, glued and screwed for sag resistance
  • Sanded plaster edges with 60-grit to expose clean bonding surfaces
  • Applied Zinsser Gardz to seal plaster and compound zones
  • Trim-Tex Fast Edge installed on all ceiling-to-wall angles
  • Rock Splicer used on butt joints
  • FibaFuse used on all flats and butts
  • ProForm Quick Set 5-Minute Mud for all taping and finishing
  • Primed with Prep-rite primer
  • Painted two coats of flat white to match existing ceiling
  • Touched up wall transitions with matching paint
Patch City

Rental Rehab — Drywall Repair & Prime

The Project

A rental property being rehabbed by the owners needed 25+ drywall patches addressed across the site. Some patches had been previously installed by the owners; the rest were cut back square and new drywall installed, then taped and finished for consistent surface alignment.

What Was Done

  • 25+ drywall patches addressed
  • Previously installed patches cut back square, drywall installed, taped and finished
  • Previously finished areas re-coated for uniform texture
  • Two corner beads installed
  • Two walls skimmed two coats for correction and consistency
  • Dustless sanding
  • Final prime: Sherwin-Williams Prep-rite ProBlock for adhesion and stain resistance
Coastal Club — Lewes, DE

Water Damage Repair

The Project

Water damage to a ceiling in the Coastal Club community required a full tear-out and rebuild. All exposed framing was treated with Fiberlock ShockWave before new materials went in.

What Was Done

  • Prep/protect
  • Cut out and dispose of damaged drywall
  • Install Rock Splicer
  • Secure existing drywall
  • Clean all exposed framing with Fiberlock ShockWave
  • Install Rockwool insulation
  • Install 1/2" drywall
  • Tape/finish using Fiba Fuse and Quick-set 5
  • Dustless sanding
  • Prime/seal affected areas using BIN Shellac
  • Paint ceiling and 2 walls using matching paint
Beach Condo

Painted Popcorn Ceiling Removal

The Project

Not all popcorn is created equal. This ceiling had been painted over with a satin finish, which meant the standard wet-and-scrape method only went so far. It ended up having to be dry scraped with a 3" drywall knife—slow, tedious work, but the only way to get it done right.

What Was Done

  • Prep/protect
  • Popcorn texture removed (wet scrape + dry scrape with 3" knife)
  • Dustless sanding with 80-Grit
  • Skimmed 2 coats using a lightweight joint compound (3 coats in some areas)
  • Dustless sanding with 180-Grit
  • Prime/seal using SW Pro Block
  • Painted 2 coats using SW Pro Mar Ceiling Paint tinted Pure White (SW-7005)
  • Walls cut in at top using SW Duration in Agreeable Gray (SW-7029)
Condo

Ceiling Repair — Correcting a Previous Bad Repair

The Project

A previous drywall repair in this condo consisted of slapping up a vent rather than patching the hole, which led to warm air going straight into the duct chase—creating condensation that damaged the surrounding drywall. The ceiling was removed, the trunk was wrapped, and new drywall was installed with entryways sealed to prevent warm air from getting in.

What Was Done

  • Ceiling removed and trunk wrapped
  • New drywall installed with entryways sealed to prevent warm air intrusion
  • All drywall taped using Fiba Fuse Max
  • Pre-existing texture scraped and skimmed for a new smooth finish
  • Ceilings painted in Sherwin-Williams Premium Ceiling Paint
  • Walls touched up in matching color using SuperPaint Satin
Bayfront at Rehoboth, DE

Water Damage Repair & Finish Restoration

The Project

Back for another repair at Bayfront at Rehoboth, this water-damaged area above and between the windows needed a properly finished drywall patch along with ceiling, trim, and wall work to bring the space back together. At the homeowner’s request, the decorative tree planter was removed and the remaining mounting holes were repaired.

What Was Done

  • Installed a 5/8" drywall patch
  • Taped using FibaFuse and Fast Edge
  • Finished and sanded the repair
  • Primed/sealed using Sherwin-Williams ProBlock
  • Applied two coats of matching Sherwin-Williams ProMar Flat White ceiling paint
  • Reinstalled and caulked the molding, then painted it with Zinsser Perma-White Semi-Gloss
  • Coated the wall using the matching blue paint
  • Removed the decorative tree planter and patched its mounting holes
Bethany Beach, DE

Exterior Painting — Trim, Foundation & Peak Details

The Project

This Bethany Beach exterior painting project was completed across two visits at the homeowner’s request. The initial visit covered the majority of the exterior trim and the foundation after surface cleaning. We returned in May 2024 to paint the gables and cornice at the peak, along with the porch area, completing the remaining exterior details the homeowner wanted addressed.

What Was Done

  • Cleaned all areas receiving paint using Mold Armor E-Z House Wash
  • Painted the majority of the exterior trim with Sherwin-Williams Emerald Rain Refresh in Extra White, Satin
  • Coated the foundation with Sherwin-Williams Loxon Self-Cleaning Acrylic in a flat finish
  • Foundation color: Evening Shadow (SW 7662)
  • Returned later to paint the gables, peak cornice, and porch area with Emerald Rain Refresh Extra White, Satin
Lewes, DE

Exterior Finish Refresh

The Project

This Lewes exterior refresh focused on the finished details visible across the front elevation and covered porch. The completed white work was photographed from the entry, front elevation, garage side, and porch so the architectural details can be seen from more than one angle.

Finish Used

  • Sherwin-Williams Emerald Rain Refresh
  • Extra White
  • Satin finish
  • Finished exterior details documented across the front elevation and covered porch
Bethany Beach, DE — The Salt Pond

Ceiling Seam Repair & Refinish

The Project

Existing ceiling repairs at this Salt Pond home had been started with mesh tape and pre-mixed compound. The affected seams were rebuilt by locating the framing, securing the drywall, removing the failed repair material, and creating a broader, level finish across the repair areas. Water stains were sealed before the ceiling received its final paint finish.

Repair Process

  • Located framing through the repair areas and added screws to secure the drywall
  • Cut out failed seams and removed the existing mesh-tape repair material
  • Prefilled with quick-set, then taped with FibaFuse and all-purpose joint compound
  • Applied a level coat of 5-minute quick-set using a 24-inch Level 5 skimming blade
  • Sealed water stains using Sherwin-Williams Extreme Block
  • Dustlessly sanded with a Festool ETS, interface pad, and net abrasive
  • Primed with Sherwin-Williams Prep-Rite ProBlock
  • Applied two coats of ProMar Flat White to the affected areas
Lewes, DE

Drywall Correction & Interior Refinish

The Project

A previous contractor had installed the drywall backward, leaving visible seams and uneven wall areas. Full removal and correct reinstallation would have been the more complete corrective option. After already paying for the earlier work, however, the homeowner chose a repair-focused path to improve the appearance without taking on the added cost of demolition and replacement. KD Drywall N Paint was called in to locate framing, secure the board, rebuild the affected seams, and create a smooth, level finish before repainting the affected areas.

Correction & Finish Process

  • Located and marked studs, uneven areas, and visible or damaged tape seams
  • Added approximately 50 screws to secure the drywall
  • Applied a clear bonding primer
  • Replaced one tape seam using FibaFuse MAX
  • Used approximately half a bag of Quick-Set 5, then applied lightweight joint compound
  • Dustlessly sanded the repaired surfaces
  • Applied one coat of Prep-Rite ProBlock
  • Applied two coats of Sherwin-Williams Emerald Matte finish
Fenwick Island, DE

Deck Preservation — Gray Birch Solid Stain

The Project

The homeowner wanted to extend the enjoyment of this large deck and pool area for as long as possible before a future replacement. The completed finish refreshed the broad deck surface, steps, pool surround, and connected outdoor areas while preserving the home’s coastal gray palette.

Finish Used

  • Sherwin-Williams SuperDeck Solid Stain
  • Gray Birch — SW-3013
  • Completed deck, steps, pool surround, and connected outdoor-area views documented from ground level and aerial angles
Rehoboth Beach, DE

Recurring Drywall Crack Repair

The Diagnosis

This upper wall repair had been addressed at least two or three times before. Once the old layers of mesh tape and compound were opened, the underlying issue became clear: the crack ran through the drywall sheet itself, not simply along a failed seam. That distinction changed the repair plan.

Why the Cause Matters

Covering a visible crack without identifying what is underneath can leave the real issue in place. For this project, the repair began by exposing the full break, securing the affected area, and rebuilding the damaged section instead of adding another surface patch over the previous repairs.

Corrective Work

  • Affected area secured and prefilled with quick-set
  • FibaFuse MAX applied across the cracked seams and the main break in the drywall sheet
  • A second 7-inch-wide FibaFuse layer added across the broader repair area
  • Primed and sealed with INSL-X
  • Painted to match in Sherwin-Williams Cashmere Flat — Rainwashed
Ocean City

High-Ceiling Drywall Cover & Custom Details

The Homeowner’s Approach

In this eclectic home, the damaged popcorn ceiling sat high above the living area and spiral staircase. Rather than scrape the existing texture and patch the damaged area, the homeowner chose to install new drywall over the ceiling.

Ceiling Transformation

  • New drywall glued and screwed over the existing popcorn ceiling
  • New surface primed and painted for a smooth, clean finish
  • Work completed around the tall living area, brick fireplace, and spiral staircase

Custom Finishing Touches

Once the ceiling work was complete, the homeowner’s requested boat and light were hung to finish the room and bring their vision together.

Lewes, DE

Cedar Tone Natural Deck Staining

The Project

This deck, stair, railing, and lattice work received a transparent exterior-stain finish that refreshed the wood while allowing its natural grain and texture to remain visible.

Finish Used

  • Sherwin-Williams SuperDeck Modified-Oil Transparent Stain
  • Cedar Tone Natural
  • Completed deck platform, stairs, railings, and lattice documented from multiple exterior angles

Natural Wood Character

The transparent Cedar Tone Natural finish gives the deck an even, warm appearance while keeping the grain part of the finished look rather than covering it with an opaque coating.

Greenwood, DE

Roof-Leak Ceiling Repair & Stain Blocking

The Situation

A roof leak had damaged a ceiling tape seam. The project also included treating smoke staining above the stove so the repaired ceiling could be properly prepared and refinished.

Repair & Prep

  • Damaged tape seam cut out
  • Repair area sealed before quick-set application to support adhesion on the non-porous surface
  • Screws added to secure the affected area
  • FibaFuse MAX embedded with all-purpose compound for the tape coat
  • Smoke damage above the stove sealed with Sherwin-Williams Extreme Stain Blocker

Finish

The repairs were primed with Sherwin-Williams Prep-Rite ProBlock, then the ceiling received two coats of Sherwin-Williams Premium Ceiling Paint for a uniform finish.

Bear Trap Dunes — Ocean View, DE

Whole-Home Color Refresh & Detail Painting

Repair Before Paint

Before the color work began, 14 drywall repairs were completed throughout the home with matching texture so the finished walls and ceilings had a consistent starting point.

Core Finish Plan

  • Ceilings: Sherwin-Williams Premium Ceiling Paint
  • Walls: Sherwin-Williams Emerald Heron Plume, Matte
  • Doors, fireplace, trim & spindles: Sherwin-Williams Emerald Urethane Enamel, Extra White, Semi-Gloss
  • Fireplace accent wall: Sherwin-Williams Emerald Needlepoint Navy, Matte
  • Kitchen island wall: Sherwin-Williams Emerald Ironclad, Flat
  • Kitchen-island trim: Sherwin-Williams Emerald Urethane Enamel, Ironclad, Satin

Room-Specific Color

The bathroom was finished in Sherwin-Williams Emerald Sea Salt, Matte. The front living room’s batten accent wall received Emerald Jade Dragon in a Flat finish, and the interior face of the front door was finished in Emerald Urethane Enamel Salty Dog, Satin.

Oceanfront Condo

Popcorn Ceiling Removal & Smooth Refinish

Containment & Preparation

The living area was carefully protected before removal work began, using overlapping 4-mil plastic on the floor and pre-taped masking film across the walls and furnishings.

Ceiling Restoration

  • Existing popcorn texture scraped from the ceiling
  • Surface primed and sealed with Loxon, with attention to adhesion before the finish work
  • Skim work completed as needed using Plus 3 joint compound
  • Sanded, then primed and sealed with Zinsser
  • Finished with two coats of Sherwin-Williams Premium Ceiling Paint

Final Detail Work

The wall-to-ceiling edges were cut in by brush and mini roller using a matched Sherwin-Williams SuperPaint Satin finish, keeping the transition clean around the newly refinished ceiling.

Millsboro, DE

Drywall Correction & Full Interior Repaint

The Call

The homeowner called KD Drywall N Paint after becoming uncomfortable with portions of drywall work that had been started by another contractor. The documented conditions included improperly installed metal corner bead, mesh tape under premixed compound, extensive paper tape, and rough finish areas.

Correction Work

  • Located mesh tape cut out and replaced with FibaFuse MAX
  • Existing corner bead removed and replaced with Trim-Tex Fast Edge 3.75"
  • Angles feathered to approximately 6 inches and selected flat joints brought out to approximately 24 inches to smooth the finish
  • Completed work sanded smooth, then primed and sealed before paint

Interior Finish

The walls received two coats of Sherwin-Williams Emerald in Accessible Beige (SW 7036), Matte. Ceilings were finished in Sherwin-Williams Premium Ceiling Paint, Flat White. Cutwork was completed before rolling to keep the 18-inch Arrowworth microfiber roller clear of debris during the finish coats.

Rehoboth Beach, DE

Recurring Repair Correction & Matched Repaint

What Was Found

Multiple repair areas had mesh applied over paper, while the earlier damage underneath had not been properly addressed. The visible cracking and failed layers needed to be opened rather than simply covered again.

Repair Process

  • Failed repair areas cut out
  • Drywall secured before rebuilding the repair
  • Areas prefilled and taped with FibaFuse MAX
  • Festool used for dustless/minimal-dust sanding
  • All repairs primed and sealed with Sherwin-Williams Prep-Rite ProBlock

Matched Finish

The repaired areas were painted to match the existing Sherwin-Williams Knitting Needles and Sea Salt finishes, restoring the entry and adjoining wall areas without changing the homeowner’s established color plan.

Millsboro, DE

Sagging Ceiling Replacement & Refinish

Why Replacement Made Sense

The existing 3/8-inch ceiling drywall had served the home for about 25 years before beginning to sag. Rather than trying to finish over a compromised ceiling surface, the room was prepared and protected, then the existing drywall was carefully removed.

New Ceiling System

  • New 1/2-inch drywall glued and screwed in place
  • Joints taped with FibaFuse
  • Trim-Tex Fast Edge used at the off angles
  • Trim-Tex Buttboard installed at butt joints, allowing those joints to be finished within approximately 12 inches
  • Festool dustless sanding used to keep the contained mess to a minimum

Prime & Paint

The new ceiling was primed and finished with two coats of Sherwin-Williams Premium Ceiling Paint. The final photos in the original post were taken while the finish was still drying.

Bahamas Beach Cottages — Bethany Beach, DE

Deck Board Repair & Solid-Stain Renewal

Repair & Preparation

A section of deck board was replaced before the finish work began. Deck cleaner was applied, rinsed, and pressure washed to remove loose paint or stain and surface debris. The deck was then allowed to dry for a day; the source post recorded a moisture-content reading of 16 before the SuperDeck finish was applied.

Coating Process

  • All spindles received one sprayed coat using a Graco QuickShot
  • Railings and deck boards received two rolled coats
  • Most deck boards received a third coat after the project photos and videos were taken
  • Finished with Sherwin-Williams SuperDeck Solid Stain — SW-6385

Finished Exterior Details

The completed coating brought the board replacement, railings, spindles, stairs, and surrounding deck surfaces into one consistent finish while retaining the original character of the cottage exterior.

Dewey Beach, DE

Water-Damage Interior Reconstruction

After Exterior Repairs

Previous water-damaged material had been torn out and treated. Once the exterior repairs were complete, the opened wall and ceiling areas were ready for the interior reconstruction work.

Rebuild & Finish

  • Rockwool insulation installed in the opened areas
  • Drywall installed and taped/finished with FibaFuse
  • Repairs skimmed with Quick Set 5
  • Repaired surfaces primed and sealed with Sherwin-Williams Prep-Rite ProBlock

Painted to Match

The repaired areas were painted to match the room. The source post also notes that the ceiling had been fully painted during an earlier visit with Sherwin-Williams Premium Ceiling Paint. The final photographs document the completed bedroom after the reconstruction.

Bethany Beach, DE

Exterior Trim & Coral Odyssey Entry Door

Exterior Trim

All exterior trim was painted with Sherwin-Williams Emerald Rain Refresh in Extra White with a satin finish.

Front-Door Color

The entry door was finished in Sherwin-Williams SnapDry, Coral Odyssey (HGSW-1075), in a satin finish.

Completed Entry

The project photos document the protected door before color application, then the finished front door, trim, porch, and front exterior.

Baywood Greens — Long Neck, DE

Front-Door Repainting After Peeling

Existing Finish

The front doors were peeling and needed to be repainted. The documented process began by removing peeling paint down to bare wood rather than painting over failed coating.

Preparation & Surface Build

  • All doors sanded after peeling paint was removed
  • Bare wood spots spot-primed with Sherwin-Williams Extreme Bond
  • Grain and low areas filled with two coats of C2
  • All areas sanded again before the final priming stage

Prime & Paint

All surfaces were primed with Sherwin-Williams Prep-Rite ProBlock, then finished with two coats of Sherwin-Williams Emerald Urethane Enamel in satin. The source post notes that these photos were taken five of the six stages into the work.

Baywood Greens — Long Neck, DE

Tricorn Black & Extra White Exterior Doors

Documented Door Finishes

  • Sherwin-Williams SnapDry in Tricorn Black (SW-6258), satin
  • Sherwin-Williams SnapDry in Extra White, semi-gloss

Exterior Door Views

The photographs document finished exterior-door views at the Baywood Greens property, including Tricorn Black doors at the main entry and a finished Extra White exterior door.

Color Pairing

Tricorn Black and Extra White provide the two documented SnapDry finishes used across this set of exterior doors.

Lutheran Church of Our Savior — Rehoboth Beach, DE

22 Drywall Repairs After Electrical Work

Drywall Repair Scope

New electrical wiring left 22 small drywall repairs to complete throughout the church interior. KD Drywall N Paint was brought in for the drywall-repair portion of the work.

Repair & Surface Preparation

  • All 22 repairs taped with FibaFuse
  • Repairs finished with Quick-Set 5
  • Dustless sanding completed
  • Repairs primed and sealed with Sherwin-Williams Prep-Rite ProBlock

Coordinated Final Finish

KD Drywall N Paint completed the repair and documented primer/sealer stages. Final painting was completed by a separate crew, keeping the scope clear between the repair work and the final paint work.

Bayfront Condo

Smooth-Wall Skimming & Ceiling Texture Repair

From Knockdown to Smooth Walls

The customer wanted smooth walls in place of the existing knockdown texture throughout the condo. The work began with paper protection and a few seam repairs taped with FibaFuse.

Skim, Sand & Seal

  • First wall skim coat with all-purpose joint compound
  • Second wall skim coat with lightweight joint compound
  • Dustless sanding with a Festool Dustless Vac
  • Walls primed and sealed with Sherwin-Williams ProBlock

Bedroom Ceiling Detail

Peeling areas of the bedroom popcorn ceiling received matching texture. The ceiling was then painted with two coats of Sherwin-Williams Premium Ceiling Paint.

Residential Garage Project

Garage Wall & Ceiling Finish

Documented Work Sequence

The photo sequence begins with full floor protection in place while the garage wall and ceiling surfaces were in the preparation stage. Later views document the completed white wall and ceiling surfaces across the garage.

Garage Details

The images document the finished surfaces around the garage doors, openers, electrical panels, utility equipment, concrete floor, and interior access door.

Completed Views

The final photographs show the garage from several angles, including broad wall and ceiling views with both garage doors open and closed.

Dagsboro, DE

Whole-Home Pure White Repair & Repaint

Repair Work Throughout

The project included extensive drywall repairs throughout the home, along with repair of minor water damage. All repairs were completed with FibaFuse and Quick-Set 5 before the documented primer/sealer and paint stages.

Stain Treatment & Preparation

  • Water stains primed and sealed with B-I-N oil-base primer
  • Other drywall repairs primed and sealed with SW Multi-Use

Pure White Finish System

  • Ceilings: Sherwin-Williams Premium Ceiling Paint
  • Bathrooms: Two coats of Sherwin-Williams Emerald Designer Edition, Pure White (SW 7005), eggshell
  • Walls: Two coats of Sherwin-Williams Emerald, Pure White (SW 7005), matte
Savannahs Landing — Ocean View, DE

All-Room Repaint & Drywall Repairs

Drywall Repair & Preparation

Drywall repairs throughout the project were completed with FibaFuse, Quick-Set 5, dustless sanding, and SW Multi-Use Primer before the documented paint stages.

Ceiling & Wall Finishes

  • Ceilings: Misty (SW 6232), Sherwin-Williams Duration, flat
  • Walls: Two coats of Site White (SW 7070), Sherwin-Williams Duration, matte

Feature Wall

The feature wall was painted in Renwick Heather (SW 2818) using Sherwin-Williams Emerald Designer Edition in eggshell.

Ocean View, DE

36 Seam, Corner-Bead & Nail-Pop Repairs

Repair Count

This repair project addressed 36 seams, 9 corner-bead repairs, and 13 nail pops throughout the documented area.

Documented Repair Process

  • Damaged seams cut out and drywall secured
  • FibaFuse installed and finished
  • Corner bead secured and finished
  • Nail pops removed and filled
  • Dustless sanding completed

Primer & Sealer

The repairs were primed and sealed with Sherwin-Williams Prep-Rite ProBlock after sanding.

Swann Cove West — Selbyville, DE

Minor Drywall Repairs & Holly Glen Repaint

Repair & Primer Stage

Minor drywall repairs were completed and primed and sealed with Sherwin-Williams Prep-Rite ProBlock.

Documented Finish

Two coats of Sherwin-Williams Emerald were applied in Holly Glen (SW 9678) with a flat finish.

Milton, DE

Siding Removal, Drywall Installation & Chantilly Lace Finish

Drywall Installation

Existing siding was removed, then new drywall was installed with glue and screws. Tear-away L-bead was installed at the ceiling and floor and around the door casings and trim.

Taping & Finishing

  • All seams taped with FibaFuse
  • Tape coat completed with USG all-purpose joint compound
  • Finishing completed with Quick-Set 5 after the tape coat dried
  • Festool dustless sanding completed

Primer & Paint

Surfaces were primed and sealed with Zinsser, then finished with two eggshell coats of Benjamin Moore Chantilly Lace (OC-65).

Bethany Beach, DE

Waterloo Deck Solid-Stain Finish

Documented Deck Finish

This deck was finished with Sherwin-Williams SuperDeck Solid Color Stain in Waterloo (SW 9141).

Milton, DE

Sunroom Ceiling Restoration in Crossroads

Documented Condition

This project addressed a wood sunroom ceiling after documented soft-wash-related damage. The existing condition limited how far the ceiling could be sanded.

Restoration & Stain Finish

The wood ceiling was sanded down and finished with Sherwin-Williams WoodScapes Poly Semi-Transparent in Crossroads (SW 3521).

Water Damage & Mold Remediation

Beachfront Condo — Mold Remediation

Containment & Material Removal

After water damage from the unit above went initially unnoticed until mold appeared, a containment area was created with 6-mil plastic and the affected ductwork was sealed. The water heater was disconnected, and affected materials were removed 24 inches beyond the visible damage.

Documented Remediation Steps

  • HEPA air scrubber installed during the process and left in operation for 48 hours after cleanup
  • HEPA vacuuming, hand-cleaning with a biocide, then a second vacuuming
  • ULV fogging applied before containment was removed and final cleanup was completed

Reconstruction & Paint

After demolition and remediation, new drywall was installed, taped and finished, dustless sanded, and primed and sealed. Two Sherwin-Williams coats were then applied to match the existing color.

Bethany Beach, DE

Bathroom Repaint in Aquaverde

Primer & Sealer

Surfaces were primed and sealed with Sherwin-Williams White Pigmented Shellac Primer.

Documented Finish

Two eggshell coats of Sherwin-Williams Emerald Designer Edition were applied in Aquaverde (SW 9051).

Harrington, DE

Water Damage Ceiling Repair & Repaint

Protection, Removal & Rebuild

The work area was covered and protected with Trimaco Stay Put surface protector and Plazmask plastic. Crown, approximately 30 square feet of drywall, and insulation were removed; joists were cleaned; then new insulation and 1/2-inch glued-and-screwed drywall were installed.

Drywall Finish & Paint

  • FibaFuse and Quick-Set tape and finish work, followed by dustless sanding and primer/sealer
  • Two Sherwin-Williams Premium Ceiling Paint coats across the entire ceiling
  • Wall water stains sealed with Zinsser B-I-N Shellac, then two Sherwin-Williams color-matched wall coats
  • Two Ivory crown coats in Sherwin-Williams Duration Semi-Gloss

Completion Work

A new return vent was installed, the banister was reattached, and minor downstairs repairs, painting, and cleanup were completed.

Laurel, DE

Water Damage, Mold Remediation & Popcorn Ceiling Restoration

Removal, Cleaning & Rebuild

Crown molding was removed and the popcorn ceiling was scraped. The ceiling was primed and sealed with Zinsser B-I-N Shellac; documented damaged drywall and insulation were removed; joists were cleaned with an antimicrobial; and Rockwool insulation was installed.

Ceiling Restoration

  • New drywall taped and finished with FibaFuse and Quick-Set
  • Lightweight pre-mix skim coat and dustless sanding
  • Ceiling and walls primed and sealed with Sherwin-Williams Prep-Rite ProBlock
  • Two Sherwin-Williams Premium Ceiling Paint coats on the ceiling
  • Two wall coats in Aleutian (SW 6241)
Interior Painting & Drywall Repair

Rental Refresh — Drywall Repair & Interior Paint

Refresh Work

Fresh paint and drywall repair were completed for an upcoming rental.

Documented Colors & Finishes

  • Extra White (SW 7006) in a flat finish
  • Master bedroom: Landscape (SW 1169) in a flat finish
  • Master bath: Landscape (SW 1169) in an eggshell finish
Milton, DE

Water Damage Repair, Old Repair Correction & Trim Restoration

Water Damage & Older Repair Correction

Existing drywall and insulation were removed. Joists were cleaned with ShockWave Antimicrobial Cleaner, new R-13 insulation was installed, and 1/2-inch moisture-resistant drywall was installed. Older first-floor repairs were redone with FibaFuse and Quick-Set 5, then dustless sanded.

Ceiling & Wall Finish

  • Water stains sealed with Zinsser B-I-N Shellac
  • Ceiling and affected walls primed and sealed with Sherwin-Williams Prep-Rite ProBlock
  • Two Sherwin-Williams Premium Ceiling Paint coats on both ceiling sections
  • Wall touch-ups completed to match

Trim Restoration

Areas with nail-head bleed-through and prior paint/repair failures were sanded to raw wood, primed, recoated where needed, and treated with wood filler. A second primer coat followed, trim-to-wall gaps were sealed with Sashco Big Stretch Clear, and the trim was sanded again before receiving two Benjamin Moore Advance Semi-Gloss coats.

Milton, DE

Sunroom Soffit Removal & Ceiling Replacement

Structural Updates

The soffit was removed from the ceiling of a space that was originally a sunroom, and Rockwool insulation was added to the cavity before drywall installation.

Drywall & Finishing

  • 1/2-inch drywall installed
  • Trim-Tex Butt Board used during drywall installation
  • All joints taped with FibaFuse Max
Interior Painting & Wallpaper Removal

Wallpaper Removal & Netsuke Repaint

Wallpaper Removal & Preparation

Wallpaper was removed. Sherwin-Williams PrimeRx Peel Bonding Primer was applied, and the walls were skimmed as needed.

Documented Finish

  • Two coats of Sherwin-Williams Emerald
  • Netsuke (SW 6134)
  • Matte finish
Broadkill Beach

Water-Damaged Drywall Repair

Preparation & Support

The work area was prepped and protected. Studs were located and secured, and the surface was locked with GARDZ before the repair was finished.

Documented Repair Process

  • Taped with FibaFuse and Quick-Set
  • Dustless sanding
  • Primed and sealed with B-I-N Shellac
Lewes, DE — Water Damage Repair

Plumbing-Access Water Damage Repair

After Prior Plumbing Access

The drywall had been previously opened to access plumbing. Damaged drywall was cut back square, GARDZ was applied to the water-damaged ceiling area, insulation was installed as needed, and new drywall was installed.

Documented Finish

  • Taped and finished with Quick-Set 5
  • Dustless sanding
  • Primed and sealed with B-I-N Shellac
  • One coat over the affected area and one coat across the entire wall for a uniform finish
Exterior Doors & Trim

Coastal Door & Casing Repaint

Documented Preparation

The doors were sanded, caulked, and wiped clean, then primed with Zinsser Cover Stain Oil.

Documented Finish

  • Doors: two satin coats of Benjamin Moore Aura in Bird’s Egg (2051-60)
  • Casing: two coats of Benjamin Moore Element Guard in Extra White, Soft Gloss
Mallard Lakes, Fenwick Island, DE

Kitchen Cabinet Painting in Satin White

Documented Paint System

The kitchen cabinets received Benjamin Moore INSL-X STIX Bonding Primer, followed by Benjamin Moore Scuff-X in Satin White.

Project Views

The supplied project photos document the kitchen before the cabinet finish and the completed white cabinet finish from several angles.

Ready to transform your home?

Whether it's a single room repair or a multi-phase whole-home project, we bring the same level of care and attention to every job.

REQUEST A FREE ESTIMATE
× Full view